| assembly - 2nd assembly page |
|
|
|
Page 2 of 7
Here I have set the static "end play" of the crankshaft with both my new end play shims installed into one half of the crank carrier. This is rechecked after the entire carrier is installed and torqued, ours only changed 1/2 of one thousandth of an inch, resulting in our target end play of .0045 being attained perfectly.
Marrying the two halves of the crankshaft carrier together...
Experience has taught me to assemble engines by feel... Here I am rotating the assembly as I tap the carrier housings together by hand.
Torquing the crankshaft carrier bolts to our updated specs...
"Feeling" the assembly to note tight spots or something that triggers my sense of danger. This assembly was so smooth it felt like warm butter was used for assembly lubricant! Perfect!
LN's R&R Pro Connecting Rod with it's matching PC3 coated rod bearing inserts and ARP 2000 Custom Aged rod bolts.
This view illustrates the Anti-Scuff coatings applied to the piston skirt.
|





